Plan The Shutdowns
Define the 14-machine scope and coordinate shutdowns and move sequencing around the required end-of-April deadline.
Planning and delivery of a 14-machine relocation from Villawood to Sydenham, with coordinated shutdowns, transport preparation, reconnection and recommissioning support.
Explore The Case StudyRonali Plastics needed 14 nominated machines relocated from Villawood to its new Sydenham site, with shutdowns and move sequencing planned around an end-of-April deadline.
ACS coordinated planning and delivery, including disconnection, transport preparation, reconnection and recommissioning support. Access equipment and hydraulic oil removal were provided where required, alongside custom transport support bars for machines with specific handling needs.
Restricted access and machine platform configurations required practical coordination. Final platform arrangements could only be confirmed once machinery was positioned, so the plan needed to accommodate potential changes at the new site.
Define the 14-machine scope and coordinate shutdowns and move sequencing around the required end-of-April deadline.
Arrange access equipment, including a scissor lift, remove hydraulic oil where required, and fabricate and install transport support bars for special machine requirements.
Coordinate the move to Sydenham, manage restricted access and movement paths, and confirm platform arrangements once equipment is in position.
Complete reconnection and provide recommissioning support to leave the nominated equipment ready for the next stage of operation.
The supplied photographs show the production equipment and surrounding working areas associated with the relocation. Access, machine configuration and preparation needed to be considered across the defined scope.
Equipment dimensions and platform arrangements informed positioning and access planning at the new site.
Shutdown sequencing, movement paths and installation tasks were coordinated to reduce disruption and support a controlled transition.
Shutdowns and relocation sequencing needed to align with the end-of-April deadline.
Final arrangements could only be confirmed after machine positioning, potentially requiring design changes.
Machines 8 and 9 required custom supports to improve equipment protection and handling stability during relocation.
Lift requirements, access limitations and safe movement paths needed coordination during rigging and installation.
The nominated machines were relocated to Sydenham with installation and recommissioning readiness supported through a defined, coordinated scope.
A structured shutdown and relocation plan supported schedule certainty and reduced downtime risk.
Oil management and custom transport supports addressed the handling and protection needs of higher-risk machines.
Defined responsibilities and auditable delivery supported predictable execution and site-ready installation results.
Talk to ACS about shutdown coordination, machinery relocation, reconnection and recommissioning support.