Silo Installation
ACS installed the new silo assemblies to support the batching plant’s material storage and workflow requirements.
Silo installation and batching-control upgrades for cement-based products, connecting storage, conveying and process equipment through commissioning and production validation.
Delivered For Crosbe NationalCrosbe Project
Explore The ProjectThe Crosbe National project combined silo installation with a batching plant and conveyor system upgrade for cement-based products.
ACS installed new silos to support material storage and flow through the cement-based product batching process. Heavy machinery and space already in use created a practical delivery challenge, requiring careful coordination around the working environment.
ACS completed the batching system upgrade for Crosbe National on the Crosbe project. The work included relocating and installing a control cabinet in a new control room, making minor panel modifications, upgrading field wiring and integrating the system’s inputs and outputs (I/O).
The programme continued through power-up checks, equipment commissioning and weighing-system calibration, with support for trial batches through to a production run.
Transport, silo sections and assemblies prepared at the facility.
The completed scope connected the relocated cabinet with the field equipment, followed by commissioning and production validation of the upgraded batching process.
ACS supported the sequence from calibration and trial batches through to a production run, bringing the electrical and process work together at the point of operation.
The scale of the components and the access involved in bringing them into the facility.
ACS installed the new silos as another part of the Crosbe project.
The silo installation supported material storage and workflow within the cement-based product batching plant. The supplied photographs show the silo sections, the handling equipment and the assemblies being brought together within the facility.
ACS installed the new silo assemblies to support the batching plant’s material storage and workflow requirements.
Large components and heavy handling equipment had to be coordinated within space that was already in use.
ACS managed the work safely around the machinery and space constraints, keeping coordination central to this part of the project.
Silo assemblies, surrounding equipment and the site team.
The scope connected the control-room changes with field wiring, devices and equipment serving the cement-based product batching and conveyor systems.
ACS reviewed the drawings, relocated and installed the control cabinet in the new control room, and completed minor panel modifications.
Work included cable tray installation, cable preparation and labelling, terminations and changeover across junction boxes and field devices.
The mains changeover was completed under lockout/tagout (LOTO), followed by power-up testing as part of the commissioning programme.
Load cells and weighing scales were calibrated, with support for trial batches through to a production run.
Project photographs show ACS personnel working around the batching plant, process equipment and electrical connections during installation.
The plant structure, equipment interfaces and site team during the work.
Commissioning extended beyond powering the cabinet. It covered the connected equipment, signals and process measurements needed for batching.
Motors and variable speed drives (VSDs), including communications and analogue speed-reference checks.
Vibrators, fans and valves, together with valve feedbacks and connected sensors.
Emergency stops included in the equipment commissioning and checking programme.
Load-cell and scale calibration, with attention to accuracy and return-to-zero behaviour.
Project photographs showing the cement-based product batching plant, silo installation and conveyor equipment. Select any image to take a closer look.
Installed conveyor routes, guarding and equipment interfaces, alongside the completed control cabinet, drives, PLC equipment and operator interface.
The project combined space and machinery constraints during the silo work with interface and measurement challenges during the batching upgrade.
Drive communications and the analogue speed reference required attention during commissioning.
Commissioning covered the motors and drives alongside their control signals as part of the upgraded batching process.
The compressor’s remote-control input type did not match the expected arrangement, and the pressure sensor required setup.
The remote-control interface and pressure-sensor setup formed part of the technical work around the connected equipment.
Scale accuracy and return-to-zero issues were accompanied by minor differences between the drawings and installed hardware, including a fuse-rating discrepancy.
The scope included load-cell and scale calibration, drawing review and commissioning checks before progressing through trial batches and production validation.
The silo work involved large components and heavy machinery within areas that were already in use.
ACS managed the silo installation and site work around the available space and machinery constraints, completing this part of the project safely.
Talk to ACS about silo installation, electrical integration and commissioning support for your facility.