Installed elevated yellow walkways and stairs above the Amazon conveyor network
← Projects & Proven Results
Amazon BWU4 · Conveyor & Access Installation

From Empty Warehouse.
To Operational Facility.

Mechanical and electrical installation. Extensive conveyor systems. Elevated walkways and platforms. One coordinated ACS team, working for SSI SCHAEFER at Amazon BWU4.

Explore The Installation
6 MonthsStart To Finish
47 PeopleProject Team
SSI SCHAEFERACS’s Contract Client
Amazon BWU4End Client
The Project

A Warehouse Transformed.
A Team Working Together.

An empty warehouse became an operational logistics facility through a six-month installation programme.

Working for SSI SCHAEFER, the contractor engaged by Amazon for BWU4, ACS brought mechanical and electrical teams together to install conveyor systems and the infrastructure around them. Elevated walkways, industrial platforms and access routes formed part of the installation, connecting working areas above and around the conveyors.

With a 47-person ACS project team, the project required coordinated teams across several disciplines, from installation through to testing with the client.

Conveyor Lanes Across The Warehouse
The People Behind The Project

The Team Behind The Installation.

Our mechanical, electrical and installation teams worked together throughout this six-month project for SSI SCHAEFER at the Amazon facility.

The ACS Team Behind The Amazon BWU4 Installation For SSI SCHAEFER
Installation In Progress

From Open Floor.
To Work In Motion.

These early site photographs show where the work began: an open warehouse, conveyor sections ready for assembly, and ACS personnel carrying out the installation. A closer look at the work behind the finished facility.

Our Scope

Three Disciplines.
One Coordinated Installation.

Mechanical Installation

Assembly and installation of the conveyor systems across the warehouse, bringing individual conveyor sections together into the wider material-handling layout.

Electrical Installation

Electrical installation delivered alongside the mechanical work, with ACS teams coordinating their activities as the conveyor installation progressed.

Walkways & Platforms

Installation of elevated access paths, walkways and industrial platforms over and around the conveyors, including the stairs linking these access routes.

Conveyor Network And Supporting Platforms
Delivery & Testing

From Installation
To Final Checks.

Six months of coordinated work, delivered by a 47-person ACS project team.

Coordinated Site Teams

Mechanical, electrical and access-installation teams worked within the same project programme. ACS managed its people and installation activities as the warehouse took shape.

Testing With The Client

At the end of the installation, ACS carried out testing with the client to check that the completed work met the expectations of SSI SCHAEFER and its client, Amazon.

An Operational Facility

The completed installation brought the conveyor systems and supporting walkways together, taking the project from an empty warehouse through to an operational facility.

Video From Site

The Installation
In Motion.

See the conveyor network at work.

This short clip from the Amazon project shows parcels moving along the installed conveyor lines, offering a closer look at the work delivered by ACS for SSI SCHAEFER.

Select play to watch. This clip is silent. Playback controls let you pause or view it in full screen.

Explore The Site Photos ↗
Amazon Installation · Delivered For SSI SCHAEFER
Inside The Installation

The Work, In View.

Real site photographs showing the scale of the conveyor network, the elevated access routes and the people carrying out the installation. Select any photo to take a closer look.

Plan Your Next Installation

Bring The Right Team
To Your Next Project.

Discuss your mechanical, electrical or conveyor installation requirements with ACS.

Discuss Your Project