Pact Group · Production Line Relocation

Staged Around Production.
Connected For Restart.

Electrical disconnection and reinstatement for Pact’s production line relocation from Ash Road to Pascoe’s, coordinated around tight operational windows.

RelocationManufacturingElectrical Reinstatement
Explore The Case Study
Production Line Environment
Ash Road → Pascoe’sProduction Line Relocation
Staged DeliveryPlanned Around Shutdown Windows
Electrical ReinstatementRecommissioning Support
The Brief

Moving Lines.
Managing The Interfaces.

Pact Group needed production lines disconnected, relocated by third-party movers and electrically reinstated within demanding operational windows.

ACS planned the electrical works with Pact’s reliability team, coordinating shutdown sequencing, contractor meetings, permits and safe work method statements (SWMS). The scope connected disconnection at Ash Road with staged electrical tasks at Pascoe’s and support for recommissioning.

Production priorities and mechanical readiness changed the programme along the way. ACS coordinated materials, site interfaces and the order of work so rough-in cabling and final supply-end terminations aligned with access and the distribution board changeover.

Client
Pact Group
Origin
Ash Road
Destination
Pascoe’s
Industry
Manufacturing
ACS Scope
Electrical Disconnection, Reinstatement & Recommissioning Support
Project Scope Of Work

Plan The Shutdown.
Sequence The Restart.

Plan & Coordinate

Work with Pact’s reliability team on permits, SWMS, contractor meetings and shutdown sequencing.

Disconnect For Relocation

Disconnect production lines, including Industrial line works, and coordinate the interface with third-party relocation contractors.

Reinstate Electrical Services

Complete rough-in cabling, general-purpose power outlets (GPOs), terminations and board/distribution board changeover support.

Support Recommissioning

Supply and manage materials, complete minor fabrication such as a control panel frame, and support recommissioning to restore production readiness.

Production Environment

Equipment, Services
And Site Coordination.

The supplied photographs show production equipment and facility environments associated with the case study. The electrical scope focused on disconnection, staged reinstatement and the interfaces needed for return to service.

Automated Production Equipment

Connected Production Equipment

Line reinstatement required electrical tasks to be sequenced with mechanical readiness and the movers’ programme.

Plant & Workshop Environment

Coordinating The Site Interface

Materials, access and staged electrical work were managed around changing dates and the distribution board interface.

Project Key Challenges

Changing Dates.
Clear Priorities.

Schedule Volatility

Production priorities and mechanical readiness led to date changes and stand-down days, requiring ongoing coordination.

Operational Deadlines

Tight remove, relocate and reinstate windows needed to align with Pact’s required operational targets.

Staged Electrical Interfaces

Multiple sites and contractors had to coordinate rough-in works, supply-end terminations and the distribution board swap.

Project Outcomes

Services Reinstated.
Production Readiness Supported.

The relocation was delivered through clear staging and coordination, with electrical works aligned to Pact’s production constraints.

Electrical Services Restored

Cabling, GPOs, terminations and the board/distribution board interface supported the lines’ return to operational status.

Coordinated Shutdown Delivery

Shutdown tasks were planned with the reliability team and coordinated with the relocation and mechanical works.

Managed Through Change

Materials, permits, SWMS and site interfaces were managed to reduce downtime risk and maintain progress despite schedule changes.

Plan Your Production Line Relocation

Your Shutdown Window.
A Coordinated Electrical Plan.

Talk to ACS about production line disconnection, electrical reinstatement and recommissioning support.

Discuss Your Relocation